Product 03 — Automation Integration

Autonomy into a plant that never stops.

Phased commissioning around your production calendar. Cells go in between shifts and the fleet grows one zone at a time — no downtime window to negotiate.

0 hrs production downtime
9-day mean phase
Production downtime0hrs
Zones per phase1–3
Mean phase length9days
Phase 1 — SurveyNetwork audit, floor-plan mapping, risk register
Phase 2 — InstallBetween shifts, zone-by-zone, no line stoppage
Phase 3 — Fleet rampIncremental unit commissioning, dispatcher tuning
Phase 4 — HandoverSAT, operator training, 30-day hypercare
[ Photo — night-shift commissioning, duotone ]
Automation Integration technical figure