Product 03 — Automation Integration
Autonomy into a plant that never stops.
Phased commissioning around your production calendar. Cells go in between shifts and the fleet grows one zone at a time — no downtime window to negotiate.
0 hrs production downtime
9-day mean phase
9-day mean phase
Production downtime0hrs
Zones per phase1–3
Mean phase length9days
Specification
| Phase 1 — Survey | Network audit, floor-plan mapping, risk register |
|---|---|
| Phase 2 — Install | Between shifts, zone-by-zone, no line stoppage |
| Phase 3 — Fleet ramp | Incremental unit commissioning, dispatcher tuning |
| Phase 4 — Handover | SAT, operator training, 30-day hypercare |